Construction and installation work on the project: "CHNGKM. Construction of Gas lift for oil-bearing deposits Tournaisian.

Construction and installation work on the project: "CHNGKM. Construction of Gas lift for oil-bearing deposits Tournaisian. Reconstruction of the unit system Gas lift for wells № 51, 54, 59, 123, 124"

  • Construction of the wellhead Ch51, Ch54, Ch59, Ch123, Ch124, according to the types of drawings (metering and regulating gas ,armature wells, wellhead connections)
  • The discharge line from the UMG №1 to Ch51, L-1 050p.m.
  • The discharge line from the UMG №1 to Ch54, L-45p.m.
  • The discharge line from the UMG №1 to Ch59, L-890p.m.
  • The discharge line from the UMG №1 to Ch123, L-2 620p.m.
  • The discharge line from the UMG №1 to Ch124, L-930p.m.